← Selected work

02 · Portfolio management

Investment &
Portfolio Systems

A multi-asset operating platform spanning underwriting, portfolio management, capital, financial reporting, sales, leasing and development cost control.

01

One platform across the business

One workspace across the business.

ALDER REAL ESTATE PARTNERS
Applications & Dashboards Portfolio workspace

Connected workspace

Applications & Dashboards

One access point for investment, development, operating and reporting workflows.

INVESTMENTS & CAPITAL
Acquisitions GIS Parcel, ownership and physical diligence
Market Intelligence Demand, supply and comparable context
Acquisitions & Underwriting Pipeline, diligence and scenario analysis
Portfolio Performance Project status, returns and watch items
Capital & Investors Commitments, allocations and distributions
Loans & Debt Capacity, rates, maturity and runway
FINANCE, OPERATIONS & ADMINISTRATION
Accounting Statements Sage entity and period reporting
Project Returns Investment-level cash flow and economics
Sales & Inventory Closings, availability and pricing
Leasing & Operations Occupancy, NOI and physical status
Budget vs Actuals Cost control through phase and task
Reporting Administration Subscriptions, access and recurring delivery
Investment, accounting, operations and reporting in one workspace. Project information and figures are illustrative.
02

Capital & investor visibility

Portfolio capital and investor economics.

CAPITAL WORKSPACE

Portfolio Capital

Active Pipeline Returns Commitments Investors
ACTIVE PROJECTS 8 4 asset strategies
INVESTED EQUITY $86.4M through current period
REMAINING COMMITMENTS $22.8M available to allocate
WEIGHTED FORECAST IRR 14.6% current forecasts
ACTIVE INVESTMENTS

Performance and capital position

Updated Sep 2026
Project Strategy Equity Forecast IRR Multiple Remaining Status
Harbor Point Mixed use $18.2M 16.8% 1.92x $3.4M On plan
Meridian East Residential $14.6M 13.9% 1.71x $5.2M Watch
Cedar Ridge Land $11.4M 12.7% 1.58x $2.8M On plan
Northline Vertical $16.8M 15.4% 1.84x $4.1M Review
Stonebridge Commercial $13.7M 14.2% 1.76x $3.6M On plan
Portfolio 5 shown $74.7M 14.8% 1.77x $19.1M
CAPITAL RECYCLING

Contributions and distributions

2023–2030
YearActive contributionsPipeline contributionsRealized distributionsForecast distributions
2023$6.2M$1.4M$0.8M—
2024$9.1M$2.3M$1.9M—
2025$4.8M$1.7M$3.2M—
2026$2.6M$1.1M$1.2M$4.8M
2027$1.4M$0.9M—$5.6M
2028$0.8M$0.6M—$6.7M
2029$0.4M$0.3M—$3.9M
2030———$2.5M
INVESTOR PORTFOLIOS

Commitment, allocation and cash-flow visibility

Representative entities
Investor Committed Allocated Contributed Distributions Net cash flow Portfolio IRR
Ridgeway Partners $8.0M $7.4M $5.4M $2.1M ($3.3M) 14.9%
Foundry Holdings $6.5M $6.1M $4.7M $1.8M ($2.9M) 13.7%
Lakeview Capital $5.0M $4.6M $3.6M $1.5M ($2.1M) 15.2%
INVESTOR GROUP ALLOCATION

Commitment by investment strategy

Representative entities · $ in millions
Investor groupMaster plannedVertical residentialCommercialLandTotal committedUnallocated
Ridgeway Partners$3.2$2.4$1.0$0.8$8.0$0.6
Foundry Holdings$2.6$1.8$1.2$0.5$6.5$0.4
Lakeview Capital$1.7$1.4$0.9$0.6$5.0$0.4
Active investments, capital timing and investor commitments. Names and values are fictionalized.
Pipeline, commitment allocation & distribution detail
PIPELINE

Opportunity underwriting and capacity

4 active opportunities
Opportunity Stage Strategy Land cost Equity need IRR Multiple Timing
Westfield North LOI Residential $18.6M $7.2M 15.8% 1.88x Q1 2027
Riverbend Diligence Mixed use $24.3M $9.8M 17.1% 2.04x Q2 2027
Northgate Pricing Land $11.9M $4.6M 13.4% 1.62x Q3 2027
Oak Crossing Screening Commercial $8.7M $3.1M 14.2% 1.71x Q4 2027
COMMITMENT CAPACITY

Allocation by investment strategy

$109.2M committed
Strategy Committed Allocated Contributed Unfunded Available
Master planned communities $42.0M $37.4M $29.1M $8.3M $4.6M
Vertical residential $31.5M $28.7M $22.6M $6.1M $2.8M
Commercial $19.7M $17.1M $13.8M $3.3M $2.6M
Land $16.0M $14.6M $12.1M $2.5M $1.4M
Total $109.2M $97.8M $77.6M $20.2M $11.4M
CAPITAL RECYCLING

Project distributions by year

$ in millions
Project 2025 A 2026 F 2027 F 2028 F 2029 F Total
Harbor Point $0.8 $1.2 $3.4 $2.1 $1.6 $9.1
Meridian East — $0.5 $1.8 $2.7 $1.4 $6.4
Cedar Ridge $0.4 $0.8 $1.1 $0.9 $0.7 $3.9
Northline — — $0.6 $1.9 $2.8 $5.3
INVESTOR ECONOMICS

Vehicle and project exposure

Representative investor
Vehicle / project Committed Contributed Forecast distributions Forecast profit EM
Ridgeway Partners I $8.0M $5.4M $8.8M $3.4M 1.63x
Harbor Point $3.2M $2.4M $4.1M $1.7M 1.71x
Meridian East $2.8M $1.9M $2.9M $1.0M 1.53x
Northline $2.0M $1.1M $1.8M $0.7M 1.64x
03

Debt & financial reporting

Debt facilities and financial statements.

LOANS & DEBT

Facility Monitoring

As of September 2026
OUTSTANDING $118.3M of $204.0M capacity
REMAINING CAPACITY $85.7M across all facilities
WTD AVG RATE 7.18% on outstanding balance
MONTHLY BURN $0.57M interest reserves
TERM < 12 MO 1 requires attention
IR RUNWAY < 50% 1 below threshold
Harbor Point $31.8M of $66.0M capacity
Rate
7.65%
Term
19 mo
IR runway
28.4 mo
Burn
$244K
Meridian East $42.6M of $52.0M capacity
Rate
6.90%
Term
38 mo
IR runway
14.7 mo
Burn
$196K
Northline $25.4M of $44.0M capacity
Rate
7.35%
Term
9 mo
IR runway
11.2 mo
Burn
$87K
Stonebridge $18.5M of $42.0M capacity
Rate
6.82%
Term
27 mo
IR runway
31.8 mo
Burn
$43K
Class / community / lender Originated Capacity Drawn Balance Util. Remaining Forecast thru term Rem. IR Rate Term ends Extension / risk
LAND FACILITIES 2 active · $74.4M outstanding / $118.0M capacity
Harbor Point / Lender A Feb 25 $66.0M $46.7M $31.8M 48.2% $34.2M $8.4M $9.2M 7.65% Apr 28 1 × 12 mo / monitored
Meridian East / Lender B Nov 24 $52.0M $48.1M $42.6M 81.9% $9.4M $39.8M $2.9M 6.90% Nov 29 2 × 12 mo / within plan
VERTICAL CONSTRUCTION 2 active · $43.9M outstanding / $86.0M capacity
Northline / Lender C Aug 24 $44.0M $29.3M $25.4M 57.7% $18.6M $21.7M $1.2M 7.35% Jun 27 1 × 6 mo / maturity watch
Stonebridge / Lender D May 25 $42.0M $22.9M $18.5M 44.0% $23.5M $11.2M $6.4M 6.82% Dec 28 1 × 12 mo / within plan
Facility-level debt monitoring across capacity, utilization, burn, rate, interest-reserve runway and maturity.
Financial reporting

Balance Sheet · Income Statement · Statement of Cash Flows

FINANCE · SAGE INTACCT

Financial Statements

Statement view
ENTITYHarbor Point Holdings, LLC ⌄
PERIODMonth Ended August 2026 ⌄
↻ Refresh from SageCalibrate to FRPPull TB from SageUpload TB Export
Balance SheetIncome StatementStatement of Cash Flows
↓ Download FRP↓ PDF
Harbor Point Holdings, LLC · Sage entity HP-101 Balance Sheet Month ended August 31, 2026
Assets
Cash and cash equivalents 6,248,900
Restricted cash 3,186,400
Accounts and other current assets 1,942,700
Total current assets 11,378,000
Land and development costs 48,615,200
Construction in progress 26,904,600
Other non-current assets 2,183,900
Total assets 89,081,700
Liabilities and equity
Accounts payable 3,214,300
Accrued development costs 1,600,000
Accrued interest payable 850,000
Other current liabilities 1,500,000
Total current liabilities 7,164,300
Non-current liabilities
Construction loan payable 31,822,500
Total non-current liabilities31,822,500
Total liabilities 38,986,800
Members' equity
Member contributions55,400,000
Distributions(6,800,000)
Retained earnings1,494,900
Total members' equity50,094,900
Total liabilities and equity 89,081,700
Footing check · assets less liabilities and equity 0
Entity and period reporting from Sage Intacct, with trial-balance refresh, FRP calibration and export. Balance Sheet detail shown.
04

Investment performance

Project returns and cash-flow timing.

PROJECT · CURRENT FORECAST

Harbor Point

15-year view · $ in 000s
LP IRR 18.6%
EQUITY MULTIPLE 2.14x
TOTAL PROFIT 9,480
DISTRIBUTIONS 17,770
CUMULATIVE NET CASH FLOW · $000s
$10M $0 ($10M)
2024 2026 2028 2030 2032
ANNUAL NET CASH FLOW · $000s
$6M$0($6M)
25 26 27 28 29 30 31 32

Positive cash flow Contribution

CASH-FLOW DETAIL

LP contribution and distribution schedule

2025–2032 shown
Metric Total 2025 2026 2027 2028 2029 2030 2031 2032
Preferred return 2,140 — — 420 310 335 355 360 360
Return of capital 8,290 — — 3,200 — — 2,090 — 3,000
Excess cash flow 7,340 — — 1,260 440 715 1,580 1,095 2,250
Total LP distributions 17,770 — — 4,880 750 1,050 4,025 1,455 5,610
Total LP contributions (8,290) (5,000) (3,290) — — — — — —
Net cash flow 9,480 (5,000) (3,290) 4,880 750 1,050 4,025 1,455 5,610
Cumulative net cash flow 9,480 (5,000) (8,290) (3,410) (2,660) (1,610) 2,415 3,870 9,480
Sponsor promote · reference 1,280 — — 120 60 100 350 180 470
LP returns, cash-flow timing and forecast distributions.
05

Sales & vertical operations

Sales, leasing and operating performance.

SALES & INVENTORY

Community Sales

Report as of September 2026
TOTAL UNITS 72 $174.8M volume
CLOSED 58 $131.2M volume
AVAILABLE 9 $22.4M volume
UNDER CONTRACT 5 $21.2M volume
YTD CLOSINGS 11 $25.7M volume
STACKING PLAN

Unit-level sales status

44-unit sample · 72-unit portfolio
1701 1702 1703 1601 1602 1603 1501 1502 1503 1401 1402 1403 1404 1405 1301 1302 1303 1304 1305 1306 1201 1202 1203 1204 1205 1206 1101 1102 1103 1104 1105 1106 1001 1002 1003 1004 1005 1006 901 902 903 904 905 906

Closed Under contract Available

SALES PACE

Closings by month

Units · 2024–2026
JanFebMarAprMayJunJulAugSepOctNovDec

2024 2025 2026

FLOORPLAN ROLLUP

Pro forma vs budget vs actual

PlanUnitsSF / unitClosedAvailableUnder contractPro forma revenueBudget revenueActual + unsoldVs budget
Atlas121,7051011$27.6M$28.4M$29.1M+$0.7M
Beacon102,155811$23.8M$24.2M$24.6M+$0.4M
Crest142,2181211$31.0M$31.8M$32.6M+$0.8M
Dune112,295911$25.2M$25.8M$26.1M+$0.3M
Elm132,3861021$30.9M$31.5M$31.2M($0.3M)
Foundry122,748930$29.8M$30.4M$31.2M+$0.8M
Total72—5895$168.3M$172.1M$174.8M+$2.7M
Sales and inventory reporting across closings, availability, stacking plans, pacing and floorplan economics.
LEASING & OPERATIONS

Lease-Up Performance

Report as of September 2026
TOTAL UNITS 126
LEASED 91 72.2%
OCCUPIED 84 66.7%
AVAILABLE 35
AVG EFFECTIVE RENT $2,365
NET ABSORPTION +8
OCCUPANCY

Budget vs actual

Units
JanFebMarAprMayJunJulAugSepOctNovDec

Budget ending occupancy Actual ending occupancy

CONVERSION

Leasing funnel

Current month
Leads 246
Prospects 128 · 52.0% / 60% target
Tours 61 · 47.7% / 40% target
Applications 22 · 36.1% / 35% target
Net leases 13 · 59.1% / 55% target
FLOORPLAN PERFORMANCE

Leasing and occupancy by plan

Plan Units Leased % leased Occupied % occupied Available Effective rent
Alder 32 21 65.6% 19 59.4% 11 $2,240
Birch 20 16 80.0% 15 75.0% 4 $2,420
Cypress 25 23 92.0% 22 88.0% 2 $2,780
Dogwood 24 17 70.8% 16 66.7% 7 $2,845
Elm 18 9 50.0% 8 44.4% 9 $2,965
Fir7571.4%457.1%2$3,120
SITE STATUS

Physical unit inventory

36-unit sample · 6 phases · 126-unit community

Occupied Leased Notice Turned / available

Phase 1
A101A102A103A104A105A106
Phase 2
B201B202B203B204B205B206
Phase 3
C301C302C303C304C305C306
Phase 4
D401D402D403D404D405D406
Phase 5
E501E502E503E504E505E506
Phase 6
F601F602F603F604F605F606
Lease-up performance, conversion, floorplan economics and unit status.
Leasing incentives, renewals & marketing detail
CURRENT INCENTIVES

Concessions by plan

Leasing policy
PlanOfferEffective through
Alder6 weeks free on 13–18 month leaseSep 30
Birch4 weeks free + reduced depositOct 15
Cypress2 weeks free on select inventoryOct 31
RENEWALS & PHASES

Expiration and phase performance

Next 90 days
Period / phaseCount / unitsRenewals / leasedNotices / occupiedStatus
October expirations42 renewals1 notice1 pending
November expirations64 renewals1 notice1 pending
Phase 1212019Stabilized
Phase 2211817On plan
Phase 3211615Lease-up
MARKETING SOURCE MIX

Lead acquisition and conversion

Year to date
SourceLeadsShareToursApplicationsNet leasesLead-to-lease
Paid search31831.8%8229165.0%
Property website24624.6%7125145.7%
Business listing19819.8%481794.5%
Listing services12112.1%311275.8%
Drive-by / referral11711.7%281065.1%
Total1,000100.0%26093525.2%
OPERATING PERFORMANCE

NOI, Forecast & Rent Detail

Actual + forecast through year-end
BUDGET NOI $1.34M
FORECAST NOI $0.96M
LENDER NOI $1.22M
FORECAST – BUDGET ($0.38M)
FORECAST

Actuals through August + forecast

$ in 000s
Line item Jan A Feb A Mar A Apr A May A Jun A Jul A Aug A Sep F Oct F Nov F Dec F Total
Net rental income 92 84 101 116 124 138 151 164 181 198 216 236 1,801
Utility & other income 11 10 13 14 13 17 19 20 21 23 25 26 212
Total income 103 94 114 130 137 155 170 184 202 221 241 262 2,013
Operating expenses (58) (61) (53) (56) (62) (65) (68) (71) (73) (75) (78) (80) (800)
Fixed expenses(21)(21)(21)(21)(21)(21)(21)(21)(21)(21)(21)(21)(252)
Forecast NOI / cash flow 24 12 40 53 54 69 81 92 108 125 142 161 961
MONTH IN REVIEW

August actual vs budget

$ in 000s
Line itemActualBudgetVarianceComment
Net rental income$164$190($26)Occupancy below budget; pricing held to support renewals.
Utility & other income$20$18+$2Reimbursements and administrative fees above plan.
Operating expenses($71)($66)($5)Water and turn costs above the monthly budget.
Fixed expenses($21)($21)—On budget.
NOI / cash flow$92$121($29)Leasing pace remains the primary driver.
Monthly NOI, annual forecast and budget variance.
Rent comparison & operating discussion items
RENTS

Current effective rent by plan

Plan Market Effective Budget Variance
Alder $2,410 $2,240 $2,300 ($60)
Birch $2,585 $2,420 $2,460 ($40)
Cypress $2,960 $2,780 $2,770 $10
DISCUSSION ITEMS

Operating follow-up

  • Water reimbursement Reconcile current billing lag and confirm catch-up schedule. Owner review
  • Interest reserve Update funding schedule against current absorption forecast. In progress
  • Renewal exposure Review upcoming expirations and concession strategy. Next meeting
06

Development budget control

Cost control from portfolio summary to phase and task detail.

DEVELOPMENT COST CONTROL

Budget vs Actuals

All projects All phases Budget / commitment / actual
BUDGET $392.8M
COMMITTED $174.6M
ACTUALS $149.2M
BUDGET − COMMITTED $218.2M
COMMITTED − ACTUALS $25.4M
BUDGET − ACTUALS $243.6M
Portfolio cost summary
Budget Committed Actuals
Cost categoryBudgetCommittedActualsBudget − committedCommitted − actualsBudget − actuals
Land$54.4M$47.3M$46.9M$7.1M$0.4M$7.5M
Sections & Pods$29.3M$15.5M$12.4M$13.8M$3.1M$16.9M
Amenities$39.8M$19.8M$15.9M$20.0M$3.9M$23.9M
Collector Roads$28.3M$12.7M$10.7M$15.6M$2.0M$17.6M
Drainage$24.8M$10.4M$8.7M$14.4M$1.7M$16.1M
Plant Facilities$21.9M$8.7M$7.3M$13.2M$1.4M$14.6M
Professional Services$10.5M$3.7M$3.0M$6.8M$0.7M$7.5M
Dry Utilities$18.7M$6.5M$5.1M$12.2M$1.4M$13.6M
Site Work$23.3M$9.9M$8.0M$13.4M$1.9M$15.3M
Operations$17.7M$5.3M$3.8M$12.4M$1.5M$13.9M
Marketing & Advertising$18.5M$7.0M$5.9M$11.5M$1.1M$12.6M
Data Center Pod$7.0M$1.8M$1.5M$5.2M$0.3M$5.5M
Commercial Sites$8.5M$2.9M$2.3M$5.6M$0.6M$6.2M
Contingency Group$14.9M$3.4M$2.7M$11.5M$0.7M$12.2M
Financing$45.6M$8.6M$7.8M$37.0M$0.8M$37.8M
Taxes$19.8M$8.7M$7.2M$11.1M$1.5M$12.6M
Soft Costs$9.8M$2.4M$0.0M$7.4M$2.4M$9.8M
Portfolio total$392.8M$174.6M$149.2M$218.2M$25.4M$243.6M
HORIZONTAL DEVELOPMENT / ROADS

Meridian East · phase and subtask detail

Expanded cost hierarchy
Section / subtaskTaskPhaseBudgetCommittedActualsBudget − committedCommitted − actualsBudget − actualsStatus
Section 12MultiplePhase 2$3.240M$1.860M$1.340M$1.380M$0.520M$1.900MIn progress
Roadway engineeringEngineeringPhase 2$218K$226K$184K($8K)$42K$34KIn progress
Paving constructionConstructionPhase 2$1,420K$1,120K$860K$300K$260K$560KIn progress
Materials testingTestingPhase 2$46K$31K$24K$15K$7K$22KIn progress
Water-district constructionInfrastructurePhase 2$1,310K$480K$270K$830K$210K$1,040KIn progress
SWPPPCompliancePhase 2$88K$3K$2K$85K$1K$86KIn progress
MailboxesSite workPhase 2$158K——$158K—$158KFuture
Section 13MultiplePhase 3$2.680M$0.740M$0.510M$1.940M$0.230M$2.170MIn progress
Paving constructionConstructionPhase 3$1,180K$370K$240K$810K$130K$940KIn progress
Roadway engineeringEngineeringPhase 3$194K$205K$144K($11K)$61K$50KIn progress
Water-district constructionInfrastructurePhase 3$1,160K$130K$100K$1,030K$30K$1,060KIn progress
Materials testingTestingPhase 3$46K$5K$4K$41K$1K$42KIn progress
MailboxesSite workPhase 3$100K$30K$22K$70K$8K$78KIn progress
Section 14MultiplePhase 4$2.300M$0.350M$0.280M$1.950M$0.070M$2.020MFuture
Paving constructionConstructionPhase 4$1,050K$200K$160K$850K$40K$890KFuture
Roadway engineeringEngineeringPhase 4$180K$100K$80K$80K$20K$100KFuture
Water-district constructionInfrastructurePhase 4$880K$50K$40K$830K$10K$840KFuture
Materials testingTestingPhase 4$40K——$40K—$40KFuture
MailboxesSite workPhase 4$150K——$150K—$150KFuture
Development budget control across budget, commitments, actual cost and three explicit variances—down to category, section, phase and subtask. Figures are illustrative and internally reconciled.